跳至主要内容

Installation Guide of Turbo Charger

Please install your turbochargers according to our following installation guide in order to avoid some unnecessary damages.
*Pre-Installation
1. Change new recommended quality oil & air filters.
2. Change recommended engine oil.
3. Pre-oil the turbo oil inlet.
4. Change new oil inlet pipes or flush the oil inlet pipes to remove flakes or carbon deposits.
5. Ensure oil supply of at least 0.5kgf/m2 or 7 psi within 3 seconds 1st engine start (if possible, use oil gauge to measure).
6. Mount turbine inlet to engine manifold
7. Attach oil inlet pipe to turbo and crank the engine a few times until oil flows out of the turbo oil drain. Then attach the oil drain pipe.
8. Connect remaining air piping hose.
9. Ensure that all bolts, screws & nuts are tightened.
10. Allow engine to idle for 5 minutes before operating at higher rpm.
11. Check for unusual noises and leaks
12. Do not operate the turbo if you suspect any problems. Consult us immediately.

*General Precaution
1. Do not let foreign objects (screws, bolts, metal fragments tools) enter ducts.
2. Ensure that suitable gasket/metal flange is used for the turbine inlet, oil inlet and oil outlet. Do not use ‘glue’ gasket.
3. Do not handle the turbo via the waste gate actuator rod or boost hose.

Refoneturbo supply complete turbocharger and aftermarket replacement turbo parts for car, trucks and heavy equipment, also provide turbocharger cartridge,turbo compressor housing,compressor wheel and turbocharger rebuild kit. High quality and for OEM,order quickly!

评论

此博客中的热门博文

The Maintenance of LED Advertising Truck

 The generator is an important part of the LED advertising truck , and it is the power supply system of the whole truck. Except for the fixed-point parking of our advertising vehicles and plugging in an external power cord for playback, our generators are needed for power supply at other times. Therefore, in order to do a good job in advertising, we must pay special attention to the maintenance of our advertising truck generators. So how do we maintain our LED advertising truck generator? First of all, we have to regularly check the generator of our advertising truck, especially the inspection of the generator oil, and change the oil frequently. Take out the oil dipstick 20 minutes after it is not started or shut down, wipe the oil dipstick with a clean rag or paper towel, reinsert it into the oil hole for 10 seconds, and then take it out to ensure that the oil reaches the middle and upper parts of the lower and upper marks on the oil dipstick. Secondly, we need ...

Functional Requirements For Truck Mounted Crane

  General truck mounted crane   have the following functional requirements: 1. The crane can be easily transferred with the truck, meeting the requirements of mobility, flexibility and no need for power supply in field operations. 2. The outrigger mechanism can lift the whole vehicle when the truck-mounted hoisting and transport vehicle is carrying out the lifting operation, so that all the tires of the car are off the ground, free from the direct operation of the lifting load, and the supporting state of the hydraulic outriggers can last for a long time. Keep the position unchanged to prevent soft legs when lifting heavy objects. 3. The length and depression angle of the boom can be adjusted, balanced and locked arbitrarily within a certain range to meet the requirements of different lifting operations. 4. The jib of the truck-mounted hoisting and transporter can be rotated and locked arbitrarily within 360 degrees. 5. The   truck-mounted hoisting truck   can lift t...

Welding Process of Fuel Tank Truck

  CLVEHICLES.COM has a tank body welding process for fuel tanker truck . Many users who use oil tankers must also want to know how the tanker is made. Now I will introduce the welding of the oil baffle. Welding of the oil baffle plate of the refueling truck: the main work is the welding of the oil baffle plate in the cylinder body. According to the above, three oil baffle plates are generally arranged inside the 6M long cylinder body, and the cylinder body is divided into four compartments. Each oil baffle plate The plate must be intermittently welded with the cylinder body. If it is a separate tank, the oil baffle will be replaced by a partition, and continuous welding must be carried out. The length of each girth weld is based on the aforementioned 6-7.5M length. The continuous welding is calculated according to half of the welding length. The total welding length of this station is about 20M, and the welding speed is calculated at 5mm/s. The welding time is about...