跳至主要内容

FengYuan Cement Bulk Trailers Display

 


Our Advantages:

1. Light weight, high benefit 

After a number of software analysis and repeated tests, the tank body, frame and other structures are made of high-strength steel, and the overall structure of the body is more reasonable.

2. Safer and more durable

The tank body is automatically welded by robots, and the air tightness test is performed at 1.5 times the working pressure, which is safer.

3. More loading, fast unloading

At a vertical height of 15m, a horizontal distance of 5m, and a rated working pressure of 0.2MPa, the average discharge speed is greater than 1.3t/min or 1.1m³/min. 

4. Transport materials, wide range

Bulk cement tanker trailer can transport cement, fly ash and other special materials. Special tank structure is designed to ensure normal discharge. More beautiful and more square The whole bulk cement tanker trailer has a compact design, beautiful appearance, smooth lines, simple and generous.

5. Less surplus, high benefit

The vulcanization angle of the tank and the radius of curvature of the tank are optimized, and the remaining material in the tank is effectively reduced.ading and unloading PO42.5 cement, the average discharge speed is about 1.5 tons/min.

With more high-quality products and first-class services, we will help the scientific and efficient development of the powder material transportation industry, get more cement powder tanker from https://www.fyvehicle.com/.



评论

此博客中的热门博文

How to Prevent Hydraulic Oil From Emulsifying On Concrete Mixer Truck?

The main cause of hydraulic oil emulsification on concrete mixer truck s is water in the hydraulic system, which is mixed with water after a long time. The removed hydraulic oil will form an emulsification of the hydraulic oil. We found that water enters the hydraulic system due to the following reasons: a. Working in a humid environment, the moisture in the air condenses due to the alternation of cold and heat, turning into water droplets and falling into the oil; b. The rainwater on the fuel tank seeps into the fuel tank due to the weak sealing of welding and connection parts; c.  Due to the damage of the pumping cylinder seal and the damage of the mixing motor, moisture is brought into the oil; d. Daily maintenance, cleaning, oil change, and maintenance process bring in moisture. To prevent the oil from emulsifying, we must first prevent moisture from entering the hydraulic system. When the car leaves the factory, the welding and connection parts must be manufactured in accord...

What is a flatbed semi trailer?

  A   flatbed semi trailer   is a very useful platform that is used in the shipping industry. It is primarily used for the transportation of shipping containers of different sizes. This is a long flat platform of either 20ft, 40ft, 48ft or 53ft length used for carrying shipping containers.  The flatbed semi trailer has no roof or walls to the side. It is a bare platform on which different container sizes are secured using container locks ready for transportation.The size of the FengYuan flatbed semi trailer loading area is determined according to the standard container size. A twist lock device for fixing the container is provided at positions corresponding to the four corners of the bottom of the container. However, it can also be used to take up other different types of loads. These different types of flatbed trailers have different capabilities and usefulness for various applications as discussed in here. Understanding their operations and basic specification...

Installation Guide of Turbo Charger

Please install your turbochargers according to our following installation guide in order to avoid some unnecessary damages. *Pre-Installation 1. Change new recommended quality oil & air filters. 2. Change recommended engine oil. 3. Pre-oil the turbo oil inlet. 4. Change new oil inlet pipes or flush the oil inlet pipes to remove flakes or carbon deposits. 5. Ensure oil supply of at least 0.5kgf/m2 or 7 psi within 3 seconds 1st engine start (if possible, use oil gauge to measure). 6. Mount turbine inlet to engine manifold 7. Attach oil inlet pipe to turbo and crank the engine a few times until oil flows out of the turbo oil drain. Then attach the oil drain pipe. 8. Connect remaining air piping hose. 9. Ensure that all bolts, screws & nuts are tightened. 10. Allow engine to idle for 5 minutes before operating at higher rpm. 11. Check for unusual noises and leaks 12. Do not operate the turbo if you suspect any problems. Consult us immediately. ...