The generator is an important part of the LED advertising truck,
and it is the power supply system of the whole truck. Except for the
fixed-point parking of our advertising vehicles and plugging in an
external power cord for playback, our generators are needed for power
supply at other times. Therefore, in order to do a good job in
advertising, we must pay special attention to the maintenance of our
advertising truck generators. So how do we maintain our LED advertising
truck generator?
First of all, we have to regularly check the generator of our
advertising truck, especially the inspection of the generator oil, and
change the oil frequently. Take out the oil dipstick 20 minutes after it
is not started or shut down, wipe the oil dipstick with a clean rag or
paper towel, reinsert it into the oil hole for 10 seconds, and then take
it out to ensure that the oil reaches the middle and upper parts of the
lower and upper marks on the oil dipstick.
Secondly, we need to check the tightness of the water pump belt and
adjust it in time. At the same time, our generator uses a closed water
cooling system, so check the coolant level, and the scale shall prevail.
Again, we have to check the intake system of the generator regularly,
from the intake port to the intake manifold. Whether the snap ring is
loose or the intake hose is broken. If there is any abnormality, it
should be replaced immediately so as not to affect the use.
CLVEHICLES.COM has a tank body welding process for fuel tanker truck . Many users who use oil tankers must also want to know how the tanker is made. Now I will introduce the welding of the oil baffle. Welding of the oil baffle plate of the refueling truck: the main work is the welding of the oil baffle plate in the cylinder body. According to the above, three oil baffle plates are generally arranged inside the 6M long cylinder body, and the cylinder body is divided into four compartments. Each oil baffle plate The plate must be intermittently welded with the cylinder body. If it is a separate tank, the oil baffle will be replaced by a partition, and continuous welding must be carried out. The length of each girth weld is based on the aforementioned 6-7.5M length. The continuous welding is calculated according to half of the welding length. The total welding length of this station is about 20M, and the welding speed is calculated at 5mm/s. The welding time is about...